Skip to content

How to Fill a Large Machine That Is Running at Half Load

A large horizontal boring mill or a gantry is an expensive asset to own and a painful one to leave half loaded. The work that fills it exists, and the reason it does not reach you is usually findability rather than demand.

Written for shops.

Buyers search by dimension, shops publish by machine name

This is the single biggest mismatch in the niche.

A buyer with a 3.2 m frame is trying to find out who can machine a 3.2 m frame. They are searching and scanning for numbers: travels, table size, load capacity, crane.

Most fabrication shop websites list machine makes and models. That is information, and it requires the buyer to look up the specification of a machine they may not know, for every shop on the list. Most will not.

Publish the numbers. X, Y and Z travels for each significant machine. Table load capacity. Crane capacity and hook height. Oven usable internal dimensions if you have one. The largest part you welded and machined in the last year, as a fact rather than an aspiration.

That one change does more for inbound enquiries than a website redesign.

Say what the whole chain is

Buyers on machined weldment work are checking whether welding and machining happen in the same building. If you own both, that is the headline, not a bullet point on page four.

If you subcontract part of it, say which part and be straightforward. Being clear about a handoff costs you some enquiries and wins you trust on the ones that fit. Being vague costs you the job after you have already estimated it.

Who actually has this work

Four sources worth knowing about:

Machine builders and OEMs. They have bases, frames and columns, usually low volume and repeating. The best long term customer for a large machine, and the hardest to win because they already have somebody.

Other fabricators. Shops that weld well and have no large machining. They are not competitors for this work, they are customers for it, and they are the fastest source to develop because they already understand what they are buying.

Plants with maintenance work. Re-machining a worn housing, re-boring a frame, repairing a structure. Irregular, urgent and usually well paid.

Intermediaries. Sites like this one, where buyers arrive with a drawing and are matched to shops whose machines take the part.

Pricing fill-in work without wrecking your rates

Be explicit internally about what fill-in work is: schedule flexible work at a schedule flexible rate.

That means it fills gaps rather than creating them. A job that must be done this week is not fill-in work. It is a priority job competing with your core customers, and it should be priced as one.

Two guardrails worth holding:

  • Do not let the fill-in rate become your published rate. If it leaks to a core customer, you have not gained capacity utilisation, you have reset your pricing.
  • Do not take work that needs a setup so specialised it blocks the machine for the tolerance of the schedule. The point of fill-in work is that it moves.

Quote fast and decline fast

Both matter equally. Fill-in work often comes from buyers who have already been let down somewhere, and speed is the whole value you are offering.

Reply within 48 hours, always, including to say you cannot take it. Shops that decline quickly and clearly get asked again. Shops that go quiet get removed from the list.

What we do with this

We match enquiries on envelope, weight, material and whether machining is in house, which is exactly the information that decides whether a part fits your machine.

Each preview shows the part type, material, size envelope, weight, quantity, weld quality level, inspection scope and region, with the buyer identity hidden, before you decide whether to pay for it. You then deal with the buyer directly. No subscription and no commission on the order.

Register your shop with your travels, table load, crane capacity and oven size, and you will only see parts your machines can take.

Frequently asked questions

Does discounting to fill capacity damage our rates?

It can, if the discount is visible to your core customers or if it becomes the expected price. Fill-in work is priced differently because the constraint is different, and it is worth being explicit internally that it is schedule-flexible work at a schedule-flexible rate rather than a new price list.

What should we publish to attract this work?

Machine travels, table load capacity, crane capacity and hook height, oven usable size, and the largest part you welded and machined in the last year. Buyers searching for large capacity are searching by dimension, and most shop websites publish machine names instead.

Is fill-in work worth the disruption?

Only if it genuinely fits the gaps. Work that has to be done this week is not fill-in work, it is a priority job competing with your core customers. The value of fill-in work is that it is flexible on date.

Need a quote for this part?

Send the drawing. We match you with up to 3 shops that weld and machine it in house, and we reply within 24 business hours.

Get matched with a weldment shop

Keep reading